CASE STUDIES
08/01/2008
Energreen - RotaChoke: Applications Offshore

There are studies showing that an offshore production rig in the North Sea has energy available for regeneration which represents 12 MW installed power. This case study will look into some of the processes which can be regenerated, and also do some economical considerations.

The latest news:

18/05/2012 Cubility's MudCube Receives Statoil Designation


17/05/2012 Greg Herrera to Participate in Panel Discussion During 2012 World Oilfield Services and Engineering Assembly


17/05/2012 ARKeX Featured in Offshore Magazine Article


16/05/2012 Energy Ventures, ZiLift and Red Spider Executives to Speak at May Scottish Oil Club Meeting


15/05/2012 OsComp Receives Coverage in Norwegian Publication "Finansavisen"